The Department of Health and Social Services (DSHS) has been directed by the State Legislature to create a Master Plan for the excess property on the Fircrest Campus located at on 15th Avenue NE and NE 150th Street in Shoreline (Capital Budget Proviso ). The excess property is defined as that portion of the campus that is not used by the Fircrest School or the Washington State Department of Health Laboratories. Work for the Excess Property Master Plan is being completed in two phases, which are described below.

Phase 1
Phase 1 of the Excess Property Master Plan has been completed. It included an analysis of potential uses for excess property based on highest and best use in terms of economic benefit, State operations, and local benefits.  Input from site users, the public, and State agencies was used to define three land use options. Phase 1 outcomes were summarized in a report and presented to the State Legislature in January 2008, which included a recommended Hybrid Option.

Recommended Hybrid Option, January 2008
DSHS recommended a Hybrid Option for future land uses, which combined aspects of the three options presented at a public open house on November 8, 2007. The Recommended Hybrid Option was developed based on analysis of public and agency comments during the planning process. In addition to presenting the Hybrid Option, DSHS also asked the legislature to consider a number of decision issues related to how the State should proceed. Links to the recommended Hybrid Option and full report are available below.

Additional Phase 1 materials can be found further below on this web page.

Phase 2
During its early 2008 session, the Legislature authorized and funded the second phase of the Excess Property Master Plan process, which will further develop the Master Plan based on the Hybrid Option for new land uses developed in Phase 1. DSHS will continue to work with the City of Shoreline, as well as involve the public in the process. Adoption of the Master Plan by the City of Shoreline is expected to occur in 2009.

Phase 2 materials include:
Fact Sheet: Phase 2 Project Overview
Fact Sheet: Phase 2 Schedule and Process

Additional Phase 2 materials can be found further below on this web page.



Materials Presented at Phase 1 Public Open Houses

October 10, 2007 Open House

Fact Sheet: Project Overview

Fact Sheet: Campus Information

Fact Sheet: Excess Property

Fact Sheet: Overview of Development of Use Options

Fact Sheet: Overview of Potential Uses

Fact Sheet: Project Goals

Summary of public comments received at 10/10/07 Open House

November 8, 2007 Open House
The options presented below are draft options from which a hybrid option will be shaped. You can provide comments on which features you like best about the options, or what other uses and/or features you feel should be considered, by using the link under Questions or Comments on the right-hand side of this page.

Summary of uses in the options

Elements Common to All Options

Draft Option 1 - Emphasis: Financial Return to the State

Draft Option 2 - Emphasis: Benefit to State Operations

Draft Option 3 - Emphasis: Benefit to Local Community

Examples Potential New Uses

Overview of Comments received as of November 7, 2007
This comment overview includes comments received via the project web page in addition to those received at the first Open House



Materials Presented at Phase 2 Public Open House

September 24, 2008 Open House


PowerPoint Presentation

Project Goals (Revised)

Public Health Benefits

Sustainability Benefits

Development of the Recommended Hybrid Option

Draft Conceptual Land Use Plan

Draft Conceptual Site Plan

Draft Conceptual Circulation Plan

Draft Conceptual Green Infrastructure Plan

Summary of Maximum Units and Square Footage



Draft Conceptual Plans
Draft Conceptual Land Use Plan
Draft Conceptual Site Plan
Draft Conceptual Circulation Plan
Draft Conceptual Green Infrastructure Plan
Summary of Maximum Units and Square Footage
Supplemental Materials
Fircrest Campus Vicinity Map
Fircrest Campus in History
1953 & 2007 aerials
Fircrest Campus Management
Questions or Comments
Send your comments
on the project here


Comments received after November 21, 2007 will be considered during Phase II
of the planning process
Contact Info
Rachael Markle
City of Shoreline
(206) 801-2531

Ed Valbert
DSHS
(253) 476-7022
Aerial Map


Click on the map
to view larger